What is Peiqi?Here's the answer!
- Categories:company information
- Time of issue:2019-01-22
- Views:0
(Summary description)The chinese transliteration of protagonist’s name in the cartoon drama <Peppa Pig> is Peiqi,
And peiqi is just the pronunciation of chinese word “配齐” ,it means fully equipped.
What is Peiqi?Here's the answer!
(Summary description)The chinese transliteration of protagonist’s name in the cartoon drama <Peppa Pig> is Peiqi,
And peiqi is just the pronunciation of chinese word “配齐” ,it means fully equipped.
- Categories:company information
- Author:
- Origin:
- Time of issue:2019-01-22
- Views:0
The chinese transliteration of protagonist’s name in the cartoon drama <Peppa Pig> is Peiqi,
And peiqi is just the pronunciation of chinese word “配齐” ,it means fully equipped.
Hey, friends, have you seen the short film "what is Peiqi" recently? have you moved by the story? This time I’ll give you a surprise,DYOE also have “peiqi” .
We have already fully equipped wind power production line, from pile driving barge to wind power installation platform to wind power operation and maintenance ship.
If you want to be good at your work, you must first sharpen your tools——130M pile driving barge .
DYOE Offshore built the 130m pile driving barge for Shanghai Xiongchen. The barge is invested by Shanghai Xiongchen ,and designed by Jiangsu ship design and Research Institute. It is the largest, most advanced and most construction capable pile driving vessel in the world at present .The 130m pile driving barge is 102.0m total length ,36.0m width, 7.8m depth, 6.0m structural draught, 125.7m height , The maximum lifting capacity is 480t, 5m, flying the five-star flag, and classified into CCS. It has completed the launching ceremony on On January 14, 2019, and subsequent construction activities are going on smoothly.
https://v.qq.com/x/page/n1356zd6usz.html
Exquisite craftsmanship, made in DYOE—500T wind power installation platform
The first vessel that DYOE build for Ouyang was successfully delivered on January 11, 2019.
The platform has the length of 75.60M, the width of 39.60M, the depth of 6.8M, with the leg of 75.00M , the open deck area is about 1800㎡, and accommodation for 40 people, and classified into CCS. The platform has many advantages, such as multi-function, wide applicability and good economy.Equipped with sea water tower, the main equipment are imported, and they are high-quality brand, DP1, which can meet the needs of displacement and positioning in the wind farm. At the same time, the platform is equipped with 500t round pile crane, and the maximum lifting height is 100m, the length of pile leg is 75m and the maximum operating depth is 40m;The pile shoe has a large area, which is especially suitable for the mud and sand of Chinese coast’s sea bottom., as well as the coastal waters of Europe and Southeast Asia. The deck area is large, and can store 1 set of 7MW fan or 2 set of 4MW fans. I believe that in the near future, "Ouyang 001" will contribute to the development of China's clean energy industry!
Operation and maintenance is very important—50m wind power operation and maintenance ship
The 50m wind power operation and maintenance ship is another wind power project cooperated by DYOE and Shanghai Xiongchen.The ship is designed as a high-speed catamaran, double rudder propeller, double bow thruster, equipped with the first six freedom wave compensation boarding, full DC electric propulsion and dynamic positioning system and other advanced equipment in China. It can carry out boarding operation under four-level sea conditions, and can resist the eight level wind, with high reliability and stability. At present, The production of the electric propulsion, power positioning, main engine and other systems are all completed, and the ship building is started in early November 2018. It is expected to be launched in June 2019. After the completion of the ship, it will be widely used in offshore wind power, offshore oil exploration, military civilian integration and maritime landing, search and rescue operations.
As DYOE have fully equipped the wind power production line, we believe that DYOE will develop and improve its building technology and capacity unceasingly, and make great achievements in the field of offshore wind power!
Scan the QR code to read on your phone
Shipyard Add: Hongqiao Industrial Park, Taixing City, Jiangsu Province, China Tel:+86-523 82363232 Email: gaoweihua@dyoffshore.com
Copyright © 2020 DAYANG OFFSHORE EQUIPMENT CO.,LTD 苏ICP备09064045号-1 Powered by www.300.cn