logo
News
Current location:
Homepage
/
/
The slipway ceremony of 8500DWT oil Tanker was successfully held
Current location:
Homepage
/
/
The slipway ceremony of 8500DWT oil Tanker was successfully held

The slipway ceremony of 8500DWT oil Tanker was successfully held

(Summary description)With the comprehensive resume work and production, China aerospace science and industry corporation , Dayang offshore equipment co., LTD. (Short for “DYOE”)have good news constantly, In this afternoon , DYOE outfit for Singapore's old customers construction of 8500 DWT Oil Tanker (SH120) in the company NO.1 Slipway on the ceremony, the owner company, China shipbuilding industry and CSTC, BV attend the meeting.

The slipway ceremony of 8500DWT oil Tanker was successfully held

(Summary description)With the comprehensive resume work and production, China aerospace science and industry corporation , Dayang offshore equipment co., LTD. (Short for “DYOE”)have good news constantly, In this afternoon , DYOE outfit for Singapore's old customers construction of 8500 DWT Oil Tanker (SH120) in the company NO.1 Slipway on the ceremony, the owner company, China shipbuilding industry and CSTC, BV attend the meeting.

Information
  With the comprehensive resume work and production, Dayang offshore equipment co., LTD. (Short for “DYOE”)have  good news constantly, In this afternoon , DYOE outfit for Singapore's old customers construction of 8500 DWT Oil Tanker (SH120) in the company NO.1 Slipway on the ceremony, the owner company, China shipbuilding industry and CSTC, BV attend the meeting.
8500DWT加油船上船台仪式成功举行
Main particulars of 8500 DWT Oil Tanker:
LOA:114.99m
Molded Breadth:19.00m
Molded Depth:10.00m
Design Draft: 7.50m
Deadweight:8500DWT
Flag:French

Scan the QR code to read on your phone

Shipyard Add: Hongqiao Industrial Park, Taixing City, Jiangsu Province, China  Tel:+86-523 82363232  Email: gaoweihua@dyoffshore.com

Copyright ©  2020  DAYANG OFFSHORE EQUIPMENT CO.,LTD  苏ICP备09064045号-1  Powered by www.300.cn