logo
News
Current location:
Homepage
/
/
Sea trial for 600T self-elevating wind turbine service unite
Current location:
Homepage
/
/
Sea trial for 600T self-elevating wind turbine service unite

Sea trial for 600T self-elevating wind turbine service unite

(Summary description)At 12 clock on 12 December of 2019,600T wind turbine platform build by DYOE commenced her 5 days sea trial trip.

Sea trial for 600T self-elevating wind turbine service unite

(Summary description)At 12 clock on 12 December of 2019,600T wind turbine platform build by DYOE commenced her 5 days sea trial trip.

Information

At 12 clock on 12 December of 2019,600T wind turbine platform build by DYOE commenced her 5 days sea trial trip. This platform has following parameters :LOA:75.6m;Molded breadth:39.6mMolded depth:7.0m,leg length approximate 85mmax working water depth 50m,which is updated design based on 500T platform delivered earlier in this year.Deck crane has been increased from 500T to 600T capacity.function with DP-1 systemThe platform can meet the requirements of operating in coastal areas, coastal areas of Southeast Asia and Europe.

Scan the QR code to read on your phone

Shipyard Add: Hongqiao Industrial Park, Taixing City, Jiangsu Province, China  Tel:+86-523 82363232  Email: gaoweihua@dyoffshore.com

Copyright ©  2020  DAYANG OFFSHORE EQUIPMENT CO.,LTD  苏ICP备09064045号-1  Powered by www.300.cn