logo
News
Current location:
Homepage
/
/
DYOE's Second 80m Hybrid MWV Sea Trial
Current location:
Homepage
/
/
DYOE's Second 80m Hybrid MWV Sea Trial

DYOE's Second 80m Hybrid MWV Sea Trial

(Summary description)At 6:00am on 11th December, DYOE's second 80m Hybrid MWV left the dock for sea trial.

DYOE's Second 80m Hybrid MWV Sea Trial

(Summary description)At 6:00am on 11th December, DYOE's second 80m Hybrid MWV left the dock for sea trial.

Information
At 6:00am on 11th December, DYOE's second 80m Hybrid MWV left the dock for sea trial.
The ship is the second 80m Hybrid MWV built by DYOE for Singapore Dayang Engineering Trading Co., Ltd. 
The ship has many advantages such as many functions, wide applicability and good economy. Equipped with hybrid power,The main equipment are imported quality brands, DP2, this ship has advanced design and excellent performance, it is an efficient green environmental protection work ship with high degree of automation.

LOA

80.00m

Breadth moulded

20.00m

Depth

8.00m

Load draught

5.60m

Accommodations for

202p

Total tonnage

5060t

Flag

Singapore

Classification

ABS

 

Scan the QR code to read on your phone

Shipyard Add: Hongqiao Industrial Park, Taixing City, Jiangsu Province, China  Tel:+86-523 82363232  Email: gaoweihua@dyoffshore.com

Copyright ©  2020  DAYANG OFFSHORE EQUIPMENT CO.,LTD  苏ICP备09064045号-1  Powered by www.300.cn