logo
News
Current location:
Homepage
/
/
6.5K GC Keel laying
Current location:
Homepage
/
/
6.5K GC Keel laying

6.5K GC Keel laying

(Summary description)In the morning of September 30, the one completed block in the cargo hold area of the first 6.5k GC, under the lifting of 300T crane, slowly and strolled across the 45-meter slipway, and finally stayed at the predetermined position on the No.2 slipway. Class KR issued Keel laying attestation.

6.5K GC Keel laying

(Summary description)In the morning of September 30, the one completed block in the cargo hold area of the first 6.5k GC, under the lifting of 300T crane, slowly and strolled across the 45-meter slipway, and finally stayed at the predetermined position on the No.2 slipway. Class KR issued Keel laying attestation.

Information

In the morning of September 30, the one completed block in the cargo hold area of the first 6.5k GC, under the lifting of 300T crane, slowly and strolled across the 45-meter slipway, and finally stayed at the predetermined position on the No.2 slipway. Class KR issued Keel laying attestation.

Scan the QR code to read on your phone

Shipyard Add: Hongqiao Industrial Park, Taixing City, Jiangsu Province, China  Tel:+86-523 82363232  Email: gaoweihua@dyoffshore.com

Copyright ©  2020  DAYANG OFFSHORE EQUIPMENT CO.,LTD  苏ICP备09064045号-1  Powered by www.300.cn